Mike Graves, COO/ Partner tells how.

 

Lipscomb had two older gyms that were not air conditioned on the campus.  We were tasked  with air conditioning both gyms. We installed 50 tons of AC with no heating in the McQuiddy Gym  and 75 tons of AC in the Student Activity Center with gas heat.  In the process we installed a Ductsox fabric duct system with an internal framework known as SkeleCore.  It is the first system of this kind to be installed in Tennessee.